Milan Expo Fair Centre

ACQUA

www.nuovosistemafieramilano.it/

Type of contract

General contracting

Location

Milan (Italy)

Construction period

2002-2005

The new Expo Fair Centre in Milan, the largest in the world with its 516,446 square metres under cover, is one of the projects that symbolises Astaldi Group’s capacities and capabilities. Concurrent engineering, in other words design activities carried out at the same time as construction activities, also allowed for the centre to be completed in 36 months (30 months of construction activities and 6 months of inspections), basically at a rate of one square metre per minute.


A record, an example of cooperation and synergy among various professional figures, which also involved the designer, the architect Massimiliano Fuksas, with an end result that combines emotional impact with the functionality needed for a building such as a trade fair centre. The centre’s “firsts” include the eight pavilions (each measuring 40,000m2)  constructed without expansion joints and built using metal spans measuring almost 50 metres in length.