Search
Primary tabs
Search results
-
Press releases
SUPER-SENIOR SECURED PIYC FLOATING RATE NOTES DUE 12 FEBRUARY 2022” (ISIN: IT0005359267) Certain amendments to ... Secured PIYC Floating Rate Notes due 12 February 2022” (ISIN IT0005359267) issued by Astaldi S.p.A. were ... due 2020” (ISIN codes:... 14 April 2020 13:17 ASTALDI: COMPOSITION PROPOSAL VOTED “YES” WITH 58.32% ...
12/14/2016 - 11:47
-
ASTALDI – WEBUILD GROUP: THE BoD APPROVES THE CONSOLIDATED RESULTS AT 31 DECEMBER 2020
balance to be paid within twelve months of the composition approval date; the effects of COVID-19, as ... remaining part of preferential debts, payment of which must be completed within twelve months of the ... 31/12/2020 Trade payables 42.6 of which due since less than three months 25.2 Financial liabilities 1.4 of ...
03/18/2021 - 09:51
-
DOCUMENTATION AVAILABLE TO THE PUBLIC AND INDEPENDENT AUDITORS’ REPORT ON THE INTERIM FINANCIAL REPORT AT 30 JUNE 2020. INFORMATION REQUESTED BY CONSOB PURSUANT TO ARTICLE 114 OF TUF
than three months n.a n.a. 13.9 43.7 Financial liabilities 29.6 0.0 37.6 32.5 of which due since less ... than three months n.a. n.a. 0.0 32.5 Tax expense 0.6 0.2 0.2 0.2 of which due since less than three ... months n.a. n.a. 0.0 0.2 Amounts due to social security institutions 0.9 0.0 0.2 0.4 of which due since ...
10/12/2020 - 19:27
-
ASTALDI: NEW CONSTRUCTION CONTRACT IN ITALY
2017- 17:11 The Astaldi Group, in a joint venture, has won the EUR 186 million construction contract ... months, including 6 months for design activities, and are to be completed in 2022. The Customer is RFI, ... and the works will be performed by Astaldi (with a 34.226% share), in a joint venture with Salini ...
02/05/2020 - 17:43
-
ASTALDI: NEW CONSTRUCTION ORDERS FOR EUR 400 MILLION IN CHILE, HONDURAS, AND POLAND
tunnels and related works. The works will have a duration of 33 months, planed to start before the end of ... 2017. The works will be performed by Astaldi (49% share), in a joint venture with the Italian company ... activities is 48 months, 12 months of which for design, and 36 months for the construction work. The ...
02/05/2020 - 17:37
-
ASTALDI, NEW RAILWAY CONTRACTS IN ROMANIA
17:06 Astaldi announces that, as part of a joint venture, has been awarded two new contracts in Romania, ... performance of the works. The works are expected to last 36 months, starting by the end of the first half of ... leader of a joint venture with FCC Costruccion SA (42% share), SC Thales Systems Romania S.r.l. (15%), ...
04/03/2017 - 17:39
-
Oryx-GTL Plant
construction project in the capacity of leader of a joint venture in relation to which it was specifically ... were completed in just 30 months. Language English Add to ...
07/27/2016 - 13:52
-
ASTALDI: NEW ORDERS IN TURKEY
16:15 Astaldi announces that, in a joint venture, it has been awarded two new contracts in Turkey, with ... Group (15% stake), in a joint venture with the Turkish companies Makyol (29%), Ictas (28%), and Kalyon ... The duration of the concession is equal to approximately 10 years, with 36 months for the construction ...
08/10/2017 - 12:05
-
INAUGURATION OF GEBZE-ORHANGAZI-IZMIR MOTORWAY IN TURKEY
years. Assigned by the Turkish Ministry of Transport and Infrastructure to the OTOYOL A.Ş. joint venture ... the works and they were completed 10 months ahead of the contractual works date scheduled for the end ... means that the last section of the project, performed by Astaldi Group as part of a joint venture ...
08/05/2019 - 16:36
-
ASTALDI ENTERS THE INDIAN MARKET WITH ACQUISITION OF THREE LOTS OF THE MUMBAI METRO RAIL PROJECT. TOTAL VALUE AT EUR 168 MILLION
15:23 Astaldi announces it has received the letter of awarding, in a joint venture, for the construction ... are planned to have a 30-month duration, with start-up following the signing of the contract, which is ...
02/07/2020 - 10:54